180 jam
Downtime saved
Rp 2,4M
Cost avoidance
14 → 4 hari
RFQ cycle
>95%
OTIF SLA
Tier-1 mining contractor Sangatta with 47-unit Komatsu PC400 + HD785 dump truck fleet — spare lead time cut from 14 days to 4 days, 180 hours downtime saved, Rp 2.4B cost avoidance in 12 months.
Average downtime 22 hrs/month due to 8-14 day spare-part lead times from previous supplier. One PC400 idled 36 hours awaiting hydraulic pump assembly — direct revenue loss from pit operations halting.
PIM structured an annual framework: ready-stock high-rotation SKUs (hydraulic + undercarriage) at main warehouse in Batuah, Loa Janan, dedicated account manager, per-coordinate dispatch tracker, and monthly automatic replenishment. OTIF (On-Time-In-Full) SLA >95% written into the contract.
Implementation of the ready-stock model successfully slashed average lead times to 3-5 days and drastically reduced annual downtime from 264 to 84 hours — saving 180 hours of valuable downtime for mining operations.